Berliner Ring Autobahn repaired over 17,000 m²

The A 100 highway runs across Berlin and connects the capital’s administrative districts Neukölln in the south, via Wilmersdorf, to Charlottenburg in the north.

The structurally deficient northern section of the expressway underwent major repairs – on road surfaces and bridges. The repair of the A 100 Berlin municipal highway illustrates the different requirements made on the rehabilitation systems for the lanes and the vertical structural components, such as, for example, bridge columns.

Gradient equalization with M3 mortar

The repairs extended over a total area of approx. 17,000 square...

Related articles:

Issue 10/2017 StoCretec

Highest cable-stayed bridge in Germany undergoes rehabilitation

The pylon of Fleher Brücke resembles the letter Y extending over the Rhine River in upside-down position. This pylon fulfils an important task because it takes up the stay cables that hold the bridge...

more
Issue 11/2019 STOCRETEC

Structurally effective concrete replacement systems

For his projects, the planning engineer determines the principles and procedures required for the repair of each building component. In this regard, he evaluates whether it is a structural repair. If...

more
Issue 11/2018 STOCRETEC

Ribbed floor slab repair with mortar grade R4

The ravages of time have taken their toll on the building substance of the high school in Balingen, Germany. In addition, the building no longer met the stringent safety requirements of today – a...

more
Issue 08/2013 Stocretec

M3-mortar for concrete repair

The continuously increasing loading of structures resulting from the effects of weathering and pollutants is adding importance to concrete repair. The choice of a suitable concrete substitute system...

more
Issue 02/2017 StoCretec

Niederselters sewage treatment plant: repair and restoration of sand trap and channel

The sewage treatment plant in Niederselters, Germany, has been in operation since 1978. In 2013, after defects in the concrete had been determined, a consulting engineering firm was commissioned to...

more