x

Related articles:

Issue 02/2019 Special corrosion protection measures

Emscher wastewater sewer

On 24 September 2018, the Emschergenossenschaft (Emscher Cooperative) commissioned the first section of the Emscher wastewater sewer. With an overall length of 51 km, the Emscher wastewater sewer runs...

more
Issue 08/2019

Reinforced concrete jacking pipes for storage sewer Berlin Mauerpark

Since the end of 2017, a wastewater project is being implemented in the very heart of the German capital, which is unusual even for a metropolis like Berlin. At a depth down to 12 m, a storage sewer...

more
Issue 03/2026 Tag 1: Dienstag, 10. März 2026

Panel 1: 2nd German Infrastructure Day 2026 - Sewer and civil engineering in the focus of modern developments

11 Sustainability in road, civil engineering, and sewer construction – the construction company’s perspective Nachhaltigkeit im Straßen-, Tief- und Kanalbau – Sichtweise der Bauunternehmung...

more