Pre-cast concrete formwork, wall system and method of construction
(10) WO 2018/018081 Al
(22) 26.07.2017
(43) 01.02.2018
(57) Formwork for building a wall system, the formwork comprising: a first precast concrete wall panel and a second precast concrete wall panel, the first wall panel being adapted for being positioned in a spaced relationship with the second wall panel; a hollow core defined by oppositely arranged surfaces of the first and second wall panels, the core being adapted for receiving wet concrete; and a connecting arrangement for inter-connecting the first wall panel with the second wall panel in the spaced relationship, the connecting...