Prefabricated footing for wind turbines
(11) EP 3 115 513 A1
(22) 17.02.2015
(43) 11.01.2017
(57) It is foreseen that the footing be executed in an excavation, such that a lower concrete slab (2), with its corresponding steel reinforcement, is obtained at the base of the same, and upon which a plurality of prefabricated partitions (3), likewise of concrete, are radially disposed in the shape of a crown at a prefabricated or executed in situ concrete zone (4), such that the spaces defined between these elements are filled with the material (5) obtained by means of the excavation, in order finally to achieve a total or partial upper...