Small wastewater treatment plants well-proven in practice
As of December 31, 2010, overall 12.07 million of the 12.52 million inhabitants in Bavaria were connected to public sewage treatment plants. This corresponds to a connection rate of 96.4 %. According to the information given by district authorities, about 68,000 that are 81 % of the small wastewater treatment plants, that will be operated in the long term, were retrofitted with state-of-the-art biological purification systems as of April 01, 2013. All small wastewater treatment plants in Bavaria will be retrofitted by 2015.
Monitoring through the portal
of small wastewater treatment plants
The...