Probst

Telescopic Screeding System TAS-UNI

Preparing the base grade is essential before installing pavement or slabs. In addition to a thoroughly compacted sub grade, a properly installed base grade at the right height is the most important requirement to ensure that pavement lasts many years, even under heavy loads and difficult weather conditions.

The Probst installation specialists offer a comprehensive selection of products for base grade preparation. With a working width of 75 up to 600 cm, the Telescopic Screeding System TAS-UNI is ideal for large as well as small construction sites. The lightweight screed system features...

Related articles:

Issue 05/2012

Screeding machine POWER PLAN PP

The Wölfel company of Erlangen (Germany) has been operating in the field of garden and landscape construction as well as in agricultural services in the greater areas of Nuremberg, Fürth and...

more
Issue 01/2020 R&W INDUSTRIEAUTOMATION

New block height measuring system for concrete blocks

One of the main quality characteristics in concrete block production is the uniform height of the individual blocks. Precise measuring of the products during production is therefore of enormous...

more
Issue 04/2013

Prefabricated concrete pole base and adjustable connector

(10) US 2013/0036679 A1 (22) Aug. 7, 2012 (43) Feb. 14, 2013 (57) A prefabricated concrete pole base and adjustable method of connection and use to receive, support, and stabilize light poles and the...

more
Issue 12/2017 GMS

Multifunctional Formwork for Plate-Shaped Precast Concrete Components

Concretes are becoming more and more high-performance, which in turn places higher and more diverse demands on the formwork used in the precast plant. This is the case in particular in the...

more