Efficiency and reliability

DIBt approved polyurea hot spraying system

 The innovative coating systems of the Gepotech® product range, granted the national technical approval of DIBt (German Institute for Construction Technology), provide a high grade and reliable manner of permanent coating.

The high-quality systems are regarded as an efficient method for long-term protection. Gepotech 11/22 is used as covering layer for both systems. This is a two-component material on the basis of polycarbamide. The product comes with a combination of properties, which cannot be matched or verified by any other coating system available at present. The new development of Schomburg for the application “wastewater” is the first coating material of its kind with the necessary proof of functioning. This is certified with the “national technical approval”.  

In comparison to conventional systems based...

Related articles:

Significant System Approval for Peikko by German DIBt

Peikko has received German national technical approval from DIBt for its DELTABEAM® Composite Beams to be used with hollow-core slabs in situations of fire. The Deutsches Institut für Bautechnik...

more

A new kind of cable loop connection system with DIBt approval

Precast construction is related to efficient manufacturing of precast concrete components and short construction periods. Therefore, also the connection of the elements among each other has to be...

more
Issue 05/2013 MC-Bauchemie

Konudur Robopox 10 with DIBt approval

Konudur Robopox 10 demonstrates its strengths when it comes to robot-based maintenance of non-accessible sewers in a friction-locked way. The two-component epoxy resin can be processed mechanically...

more
Issue 09/2017 Rapperstorfer Automation

Cage wall is granted technical approval for Germany

On June 1, 2017, the so-called “Korbwand” (cage wall) manufactured by Rapperstorfer Automation was officially approved by the German Institute for Structural Engineering (DIBt) in Berlin. The cage...

more
Issue 11/2011 In-house exhibition at SR Schindler

Aging system with coating module for concrete products

For the period of four days, the production that is normally running in the factory buildings at Hofer Straße in ­Regensburg (Germany) moved into the background. Because there was a special kind of...

more