Consistent climate, higher productivity
One curing chamber is not like another. This was also realized by the management of Idealbeton located in the German city of Montabaur in summer 2013. The company was not in the position to manufacture as many precast floor slabs, double wall and solid wall elements as well as thermally insulated wall elements as would have actually been allowed by the capacities of the up-to-date circulation system and the motivated staff. The bottleneck that slowed down the production process was the said chamber.
“Pre-heating the chamber to a desired temperature of 35 degree Celsius was not possible....