Load-bearing concrete façades at the limit of feasibility — New Karlsruhe Tax Office

There is a demand for sophisticated sandwich façade elements beyond uniform large-panel construction that offer visual depth and eye-catching textures. Planning requirements increase in line with the requirements on visual appearance. Designing the facing shells by means of finite elements requires a definition of the elastic properties of the anchors and of the bedding modulus of the insulation. These properties and suitable temperature gradients are covered only to a limited extent in technical approvals or standards. The scope of the structural specification for shells alone surprises test engineers and offers a wide range of interpretations for analysis, including legal concerns about the application of technical
approvals for anchors. Everybody expects the shells to be free from cracking to the greatest possible extent. Concrete design, on the other hand, only knows crack width control. The design of the elements alone can thus become a limit of feasibility. The façade designer is often expected to take care of the structural specification of the shell as a sideline activity. Questions and costs related to slab restraints, bracing forces, earthquake resistance and fire protection must, in any case, always be clarified at an early stage. Heavily profiled façade elements cannot simply be lifted from an inclined tilting table and transported. Horizontal lifting by means of special anchors generates high stresses resulting from adhesion to the formwork and dead load even in the fresh state. The various problems are demonstrated based on a number of projects realized by Dreßler Bau, with the Karlsruhe Tax Office façade being a prime example of cooperation between all parties involved. Architects, structural engineers and test engineers worked on the problems at hand in an open dialog, including the Technical University of Kaiserslautern, which provided special support for the application of the technical approval of the low-cost glass fiber anchor rods made by Schöck. Production of the building elements was a challenge not only in terms of craftsmanship. This is impressively demonstrated by the images included in the presentation.

x

Related articles:

Issue 07/2012

EU commission awards INSU-SHELL

The EU commission has awar­ded INSU-SHELL with the Best of the Best Life Environ­ments Award. The project partners RWTH Aachen University, DuraPact, Saint Gobain Technical Fabrics and Gimpel...

more
Issue 09/2018 SCHÖCK

New product line of façade connectors

Schöck is a renowned specialist when it comes to insulating and strengthening cantilever elements. Thus far, the company had been concentrating on balconies and stairs, but façades are currently...

more
Issue 11/2021 SCHÖCK BAUTEILE

A new precast factory as flagship for Riedelsheimer

A visual highlight, energy efficient in terms of building physics: The client, Marcus Riedelsheimer GmbH, demanded a great deal of its own new precast concrete factory. The company found the solution...

more
Issue 04/2010 An energy efficient solution for multi-layer and sandwich walls

ComBar thermal anchor: resistant against corrosion

This anchor realizes U-values between 0.236 W/m²K and 0.391 W/m²K at an average hollow wall of 30.0 cm up to 36.5 cm. Solutions with conventional lattice girders have significantly higher U-values....

more
Issue 04/2018 Liapor

Authentic aesthetics with lightweight concrete

The new office building of Spenner GmbH und Co. KG in Erwitte, Germany, has been constructed as a monolithic structure made of Liapor lightweight concrete. It features successfully executed and...

more