New construction concept for swimming pools

Bekapool, according to the supplier Steuler-KCH Schwimmbadbau, represents a totally new construction concept for swimming pools that is now being introduced to the specialist trade. Concrete, the time-tested construction material, is directly, mechanically and permanently bonded to highly resistant synthetic lining material whose impermeability offers testing capability.

Close-tolerance precast concrete elements with integrated lining technology are the basis for an innovative, comprehensive and modular construction concept for swimming pools. Defined precast concrete segments for walls and floors with integrated synthetic coating are transported completely prefabricated for every project to the construction site and are installed within a very short time. Technical pool systems such as inlets and overflows, precisely levelled overflow channels and pool head edgings as well as all other fittings are prefabricated in the plant and need only be connected at the site. Rapid and effectively planned implementation makes for short downtimes in existing pool facilities and rapid commissioning of new pools.

High degree of prefabrication

The pool material is physiologically safe, anti-adhesive, easy to clean, resistant to chloride, frostproof, UV-stable and available in a wide range of colors – it likewise offers a pleasantly warm surface structure. The smooth, jointless and homogeneous pool lining material is permanently bonded to the static concrete body.

For Bekapool, the swimming pool specialist Steuler-KCH Werkstoffe has combined material, engineering and installation into a high-performance package for new and upgraded pools. The thought-through, reliable system solution for swimming pool facilities pays off from the very start: the high degree of prefabrication and rapid and reliable implementation on site enable savings of 25 % compared to conventional construction concepts.

Bekapool also pays off during operation: ongoing maintenance costs are noticeably reduced – especially for outdoor pools. As with all its other systems, the sealing experts Steuler-KCH Schwimmbadbau offer clients, designers and planners reliable service as a one-stop supplier: planning and design, consultation, structural engineering, expert hydro-design and construction implementation. An especially assigned contact partner for all aspects involved in executing a pool construction project ensures the customer top efficiency and reliability. For such projects, Steuler-KCH specialists draw on their many years of experience as a highly versatile team and offer planners, architects and clients state-of-the-art support in all situations. This includes leading technical expertise, ongoing support and comprehensive consulting.

x

Related articles:

Issue 09/2017 STEULER-KCH

Bekapool basin for Osnabrück’s Nettebad

The non-swimmer’s pool in the outdoor area of the Nettebad in Osnabrück presented itself in dire need of refurbishment. Broken tiles, leaking drains: the basin, which had been completed in 1973, was...

more
Issue 11/2023 KANN BAUSTOFFWERKE

Stylishly designed closure for swimming-pool coping with Vios

For more and more garden owners, their private feel-good oasis is not complete without their own swimming pool. The highest-quality solution with the longest service life is an in-ground, permanently...

more
Issue 01/2019

Prefabricated self-supporting module for making building structures, more particularly swimming pools

(10) WO 2018/203269 Al (22) 03.05.2018 (57) The present invention refers to a prefabricated self-supporting module (1; 1‘) for making building structures, more particularly swimming pools (10‘)....

more
Issue 05/2018

New Sealing Profile Concept for the Albvorland tunnel

Within the scope of the pan-European high-speed rail network expansion the approximately 60 km long new ICE railway line is being developed in the south-eastern portion of the metropolitan region of...

more
Issue 08/2024 BERDING BETON

Jacking pipes for a construction project in Paris to improve the water quality of the Seine River

This gigantic project was completed in the spring of 2024 in the heart of Paris: the construction of an underground storage basin with a total volume of 50,000 m3, including a sewer 625 m long below...

more