Related articles:

Issue 05/2021

Dry connection system of prefabricated elements

(10) WO 2021/019368 Al (22) 22.07.2020 (43) 04.02.2021  (57) The present invention relates to a connection system of prefabricated elements used in the construction of industrial, commercial and...

more
Issue 11/2023

Construction method for dry-wet combined connection structure of prefabricated concrete floor slab

(10) CN115450367 (22) 05.09.2022 (43) 09.12.2022 (57) The invention discloses a dry and wet combined connection structure construction method for a prefabricated concrete floor, and belongs to the...

more
Issue 10/2019

Protective box for reinforcement connections for establishing a concrete connection

(10) DE 20 2018 101 765 U1 (22) 29.03.2018 (45) 08.08.2019 (57) Verwahrkasten für Bewehrungsan­schlüsse zum Herstellen einer Betonverbindung, die aus ei­nem zuerst gegossenen ersten Betonteil (13)...

more
Issue 04/2018

Brick-concrete integrated wall civil, engineering prefabricated member connection method, integrated building construction method

(10) WO 2018/028652 Al (22) 11.08.2017 (43) 15.02.2018 (57) A wall brick, a method for connecting wall bricks, a brick-and-concrete integrated wall connected using said connecting method, and a civil...

more
Issue 08/2021 Prefabricated wall and eassembly structure for prefabricated building, and construction method therefor

Prefabricated wall and eassembly structure for prefabricated building and construction method therefor

(11) EP 3 822 422 Al (22) 10.07.2019 (43) 19.05.2021 Bulletin 2021/20 (57) Disclosed is a prefabricated wall (1) for a prefabricated building. The prefabricated wall comprises a concrete body (2) and...

more