Legal evaluation

Varying strength values measured at the ready-ixed concrete plant and on the construction site, particularly for F5/F6 ­concrete - which party is liable?

The agreement that the ready-mixed concrete plant entered into with the shell construction contractor pertains to the supply of appropriately specified concrete. Contractual performance is governed by sale of goods law (s. 651 BGB; Bürgerliches Gesetzbuch − German Civil Code). The relevant point in time to ascertain whether products or goods are free from material defects is when the risk passes from the seller to the buyer, i.e. when the fresh concrete is handed over to the shell construction contractor on the construction site (s. 434 BGB). After handover, the buyer is bound to prove any...

Related articles:

Issue 02/2016 How the supplier of concrete components stands up to VOB ­regulations

From sales contract to contract for work?

The contract for manufacturing and supplying of precast components is a so-called contract for work and materials in the sense of § 651 BGB (of the German Civil Code). On the other hand, contracts...

more
Issue 02/2014 Legal evaluation of damage

Varying strength values measured at the ready-mixed concrete plant and on the construction site, particularly for F5/F6 concretes – which party is liable?

Concrete supply agreements entered into with large construction contractors usually include the following (or similarly worded) sentence: “The contractually agreed compressive strength class is...

more
Issue 02/2013 A defect despite passed freeze-thaw test? (Legal evaluation)

Spalling above intact near-surface aggregate particles?

Defects are evaluated in accordance with applicable legislation, rather than on the basis of technical rules and standards. The legal basis is the construction contract that the ordering party/client...

more
Issue 02/2014 Legal evaluation

Semi-precast floors. Rust spots, traces of rubber abrasion, voids –

The present case refers to the legal relationship between the shell construction contractor and the precast producer that manufactures and delivers the semi-precast floor units. Pursuant to section...

more
Issue 02/2013 Acceptance of structural concrete components

Legal point of view

Legal basis: the work This title alone is remarkable from a legal standpoint because the legal consideration starts from the work. The work whose production the contractor committed to is accepted in...

more