GSS NV – the Belgian manufacturer based in Mol – offers solutions that make the casting of floors on construction sites faster, easier and safer. The Gilbert Steel Solutions company, which was founded by Gilbert Cuypers and his wife in 2009, developed, among other things, the patented solutions GSS-Profile and GSS-Safe. By the use of these solutions only 1/10 of time is required compared to conventional methods.

In the course of the German market introduction at the end of 2023, the products had been further developed and the product portfolio was completed for the D/A/CH countries. The new and further developed solutions represent a system consisting of formwork, mounting bracket and safety post.

 

1. GSS Safe 3001 safety post (product development 31/1/2024)

The galvanized safety post fits into all GSS fastenings, whether mounted on a profile, stirrup, beam support, box, permanent concrete base or floor support. The safety post can be mounted and removed by a simple turning motion. Wood boards can be inserted into the adjustable stirrups so as to complete the fall protection. Since 2024, it is also possible to use Peri anti-fall protection barrier instead of boards.

 

2. GSS Bracket 3003O

(product development 10/08/2023)

This is a metal bracket especially developed for the German market for vertically perforated bricks, it fits into GSS-Profile/permanent edge formwork and serves the fastening of building blocks. Thanks to the various fold seams, the small plate can be used on several shapes and sizes of building blocks (e.g., Poroton vertically perforated bricks being 17.5 cm, 20 cm, 24 cm wide). After casting of concrete and removal of the fall protection system (GSS-Safe safety posts), the galvanized small plate is simply broken off.

Advantage: a cost-effective and fast way of assembly and removal of fall protection at construction sites.

 

3. GSS Box 3029 & GSS Prefab 6400 fall protection used in prefabricated walls (ideal for manufacturers of precast concrete components)

The GSS box is used to install the GSS safety system into prefabricated walls. After placing of the prefabricated wall elements, the small plates at the top and bottom are unfolded. The safety post can be inserted now without any problems. After removing the safety post, the small plates at the top and bottom can be folded back again. GSS-Prefab 6400 for permanent formwork with a height of 16-40 cm works in a similar way. Permanent steel formwork, installed in prefabricated beams or wall elements, with integrated fall protection.

Remark: The products are SGS certified and tested by the German BG Bau occupational insurance association, Dept. Prevention.

CONTACT

GSS NV

Voortbeemden 2

2400 Mol/Belgium

+32 14 49 06 80

www.gss.be


x

Related articles:

Issue 05/2024

Silo safety at last – the Shield Lite fail-safe silo protection system

Overpressurization incidents regularly occur when filling storage silos from tanker trucks, but many of them go unnoticed. However, each such incident poses a significant hazard to people, the system,...

more
Issue 02/2017 Sika

Fresh concrete composite waterproofing range extended to create complete system

Fresh concrete composite systems are increasingly being used to seal or waterproof concrete structures. They have proven their worth in construction practice, not least because they permanently ensure...

more
Issue 01/2013

Method for casting a finished-part concrete structural element, planar formwork element, and formwork

(10) WO 2012/159141 A1 (22) 23. Mai 2012 (43) 29. November 2012 (71)  WÖRLE SPAROWITZ INGENIEURE ZIVILTECHNIKER GMBH [AT/AT]; Karlauergürtel I, A-8020 Graz (AT) (57) The invention relates to a...

more
Issue 07/2010 2010 award work – safety – health

The „Occupational Safety Oscar“ for clever minds

Gudrun Loeb moderated the award presentation in the Casino of „Schacht XII“ in March 2010 during the ceremony in the historical setting of the „Zeche Zollverein“ (a former coal mine) in Essen...

more
Issue 05/2024 Day 2: Wednesday, 15th May 2024

Panel 8: Forum Innovation 2 – Innovative solutions from the supplier industry

71 Innovation in the fastening sector. New development - Presentation of the Hulco anchor bolt Innovation im Befestigungsbereich: Neuentwicklung – Vorstellung der Hulco-Ankerbolzen Dipl.-Ing....

more