Company Dosch is investing in 750 m² of new formwork

The new Logo.3 formwork for the Dosch company in corporate colours (Figure: Paschal)

The new Logo.3 formwork for the Dosch company in corporate colours (Figure: Paschal)
Construction Company Dosch is investing in approx. 750 m² of new Logo.3 formwork in corporate colours with customised cross profiles for connecting pieces.

Like Paschal, Bau-Dosch GmbH places the client at the centre of its services. "Convincing performance and the satisfaction of our customers are part of the basis of our success. We have very high expectations of ourselves and our partners", says CEO Matthias Dosch. The high quality products and the excellent supervision of Herbert Bliemetsrieder, Manager of the Paschal branch in Munich, have been a decisive factor in the many years of good cooperation and were central to the decision to invest again in Paschal formwork, according to Matthias Dosch.

Bau-Dosch was founded as a two-man business in 1995 by Alfons Dosch. Since then, the dynamic family company from Seefeld has grown steadily and now has over sixty employees. Three sons also work for the company, of whom Matthias Dosch functions as a second CEO alongside father Alfons Dosch. From the beginning, the construction company has worked with various Paschal formwork systems. In 2017 Bau-Dosch started to consider investing in the formwork division. "We are happy to invest in our own business. High quality work materials enable us to work safely and effectively. The renewed decision for Logo.3 was therefore an obvious choice", says Matthias Dosch.

 

Over 20 years of successful cooperation

The Dosch Company was already using Logo.3 from Paschal. Bau-Dosch is convinced of the efficiency, longevity and flexible applications of this formwork. With its large-size panels, it is excellently suited for housing, industrial and engineering construction.  The little panel widths and a panel height of 90 cm, Logo.3 formwork can also be used for small-area components, such as foundations, columns and beams.

Logo.3 has also proved itself for exposed concrete, which is increasingly in demand for modern administration buildings and housing construction. The low proportion of ties in the large-size panels means that it meets the stringent requirements of a concrete surface.

 

Logo.3 formwork is reliable and flexible

For Paschal, customer requirements are in the focus. Paschal considers itself a pioneer in the market in terms of implementing individual formwork solutions and manufacturing customised products. Paschal system formwork can be adapted to customers' requirements with custom-made designs, such as special panel sizes or painting in corporate colours, to provide the optimal solution for each client.

"With Paschal as our partner, nothing stands in our way in implementing our customer-specific requirements for the new Logo.3", Matthias Dosch is keen to emphasise. The new Logo.3 formwork for Bau-Dosch GmbH was supplied in Dosch red. In addition, the formwork is fitted with special cross profile to attach the Logo connecting pieces. "When setting up and dismantling the formwork, the connecting pieces can be placed practically on the panel and are therefore immediately available for the next place of action. This saves on movements and ensures shorter assembly and dismantling times", explains Herbert Bliemetsrieder

 

CONTACT

Paschal-Werk G. Maier GmbH

Kreuzbühlstr. 5

77790 Steinach/Germany

+49 7832 71 237

www.paschal.com

Related articles:

Paschal presents formwork for optimal concrete construction at bauma 2022

It’s back in October 2022: The largest construction trade fair in the world will once again open its doors in Munich, Germany. Formwork and shoring expert Paschal will be presenting its innovative...

more

Paschal: Achieve more with Logo.3 – now with new integrated clamp mounting

At Paschal the focus is on customer wishes and needs. Along with “off-the-shelf” formwork systems, the formwork expert therefore also offers customer-specific adaptations, such as the clamp mounting...

more

Paschal with innovative lightweight formwork Neor at bauma 2019

The new Paschal lightweight formwork Neorast has been specifically developed to meet the demands of customers and current requirements in the construction industry. Another development focus was the...

more

Paschal: Riebeckplatz in Halle is brought into shape with Logo.3

GP Papenburg Hochbau GmbH is currently realising its neighbourhood concept for the Millennial brand hotel using 600 m² of Paschal's Logo.3 formwork system. Prior to the commencement of the actual...

more

Paschal: Fast formwork for a large hotel complex

Paschal has proven that even large construction sites can be easily completed on time and within budget by using optimised logistical procedures and advanced formwork planning. A new, Mediterranean...

more