Umweltfreundliche vorgefertigte Betonwand, Herstellungsverfahren und Tunnel

(10) CN114033417

(22) 22.11.2021

(43) 11.02.2022

(57) The invention discloses an environmentfriendly concrete prefabricated wall, a construction method thereof and a tunnel. A tunnel wall is formed by installing a first wall, a second wall, a third wall and a fourth wall, a first connecting part is matched with a second connecting part, a fourth connecting part is matched with a third connecting part, and a sixth connecting part is matched with a fifth connecting part; the building process of the wall is simplified, the construction period is shortened, the wall is convenient to maintain, waste delayed coagulation soil is utilized in the building process, resource recycling is achieved, and the environment-friendly construction concept is met.

(71) Univ Xuzhou Technology

x

Thematisch passende Artikel:

Ausgabe 05/2023

Deckenkonstruktion und Herstellungsverfahren

(10) CN114033096 (A) (22) 13.12.2021 (43) 11.02.2022 (57) The invention discloses a fabricated concrete slab structure and a construction method.The fabricated concrete slab structure comprises a...

mehr
Ausgabe 11/2009

Patente 11

Seal for watertight concrete cellars Abdichtung für wasserundurchlässige Betonkeller (11) EP 1 905 911 B1 (22) 27.09.2007 (45) 08.07.2009 (73)?Btf Produktionsentwicklungs- und Vertriebs-GmbH,...

mehr