(11) EP2821194A1
(22) 03.07.2013
(43) 07.01.2015 Bulletin 2015/02
(57) The invention relates to a method for casting a concrete tube (8), which method comprises the steps of:
- providing an outer...
(10) US 2015/0014886 Al
(22) Feb. 15, 2013
(43) Jan. 15, 2015
(57) A preformed formwork for forming concrete floor slab for a height adjustable shipping container building structure having spaced...
(10) WO 2015/007656 Al
(22) 11. Juli2014 (11.07.2014)
(43) 22. Januar 2015 (22.01.2015)
(57) A method for producing a precast concrete tower segment of a wind turbine tower is provided. An inner...
(10) DE 20 2014 104 462 U1
(22) 19.09.2014
(45) 08.01.2015
(57) System aus Formsteinen für die Erstellung von Haltestellen (10), insbesondere Bushaltestellen, – mit einem Bordstein (11), der eine...
(10) WO 2015/000771 Al
(22) 25. Juni 2014 (25.06.2014)
(43) 8. Januar 2015 (08.01.2015)
(57) The present invention relates to a method for producing a concrete component (15), to a prefabricated...
(10) DE 10 2013 107 321 A1
(22) 10.07.2013
(43) 15.01.2015
(57) Die Erfindung betrifft ein Verfahren zur Herstellung eines Bauwerks aus Beton. Erfindungsgemäß werden Fertigbetonplatten (2)...
(10) US 2015/0007524 Al
(22) Sep.28,2014
(43) Jan. 8, 2015
(57) The invention comprises a product. The product comprises a foam insulating panel, the panel having a first primary surface and an...
(10) DE 20 2014 009 016 U1
(22) 14.11.2014
(45) 08.01.2015
(57) Fertigbauteil zur Ausbildung eines Hausanschlusses für ein Gebäude, insbesondere für mindestens ein Wohngebäude, umfassend einen...
(10) WO 2015/004196 Al
(22) 9. Juli 2014 (09.07.2014)
(43) 15. Januar 2015 (15.01.2015)
(57) Abstract: The invention concerns an adjuvant combination composed of a milling assistant and a concrete...
Normalerweise kommt der Ansturm am zweiten Messetag. Bei der Messe Bau 2015 drängten sich die Besucher bereits am ersten Tag auf den Gängen und Standflächen. Laut dem Veranstalter Messe München...