SUBMITTED BY: WECKENMANN

Innov.: System for creating precast concrete ceilings

Concrete ceilings will deform over time due to their own weight and payload. Weckenmann announced a new system, which creates a targeted camber on concrete ceiling elements. The procedure leads to two different results. Firstly, the deflection of the ceiling is reduced as well as the amount of needed material. Secondly, a flat soffit without a vertical offset is created. The latter is possible since the elements get placed horizontally and with no deflection whatsoever. The camber is placed in a predefined radius. Therefore, the camber is chosen to approach the deformation caused by the load case. To avoid the need of specific formwork tables with preinstalled formwork superelevation, the precast ceilings are formed, concreted, reinforced and compacted on flat pallets. Subsequently, the pallets arrive in the curing chamber where they get bent by adjusting the support rollers. The concrete assumes its shape and cures. After achieving its final strength, the pallets’ superelevation will be undone, and the ceiling elements will be taken off the pallet.

Contact

Weckenmann Anlagentechnik GmbH & Co. KG

Birkenstraße 1

72358 Dormettingen/Germany

+49 7427 9493-0

www.weckenmann.de

x

Related articles:

Issue 03/2020 WECKENMANN ANLAGENTECHNIK

Foundation stone for digitised pallet circulation system

In June 2019 Weckenmann Anlagentechnik GmbH & Co. KG were awarded the contract from EMC European Modular Construction GmbH to supply a state-of-the-art precast concrete plant. Weckenmann has been...

more
Issue 04/2018 Weckenmann Anlagentechnik

Retrofit of existing pallets and shuttering profiles

The Swabian equipment and machinery manufacturer Weckenmann, renowned supplier to the precast concrete industry, is distinguished by the wide product range, among others. Everything from one source:...

more
Issue 05-2022/2022 WECKENMANN

New hall with second pallet circulation system for double-wall and slab element production at Rector Lesage

The company Rector Lesage began in 2018 to establish a production unit in order to increase its production capacity and to extend its product range by adding double walls. This plant now ensures...

more
Issue 01/2015 Kinast Maschinensysteme

A not-everyday pallet circuit installed in Austria

Walter Mörzinger, Managing Director of Mörzinger Bau GmbH, and Gerd Kinast, Managing Director and owner of Kinast Maschinensysteme GmbH, met for the first time in November 2012 to talk about a new...

more
Issue 01/2012

Driven pile production on a circulation system

A new pallet circulation system went into operation in the precast concrete plant in 2010. The factory concept had to fulfill several tasks. First of all, they had to manage the limited space on the...

more