Methods for building precast concrete construction

(10) WO 2019/118563 A1

(22) 12.12.2018 

(43) 20.06.2019

(57) A method of building a precast concrete construction includes lifting one or more precast elements from a trailer load to respective designated locations in one or more floors of a building being erected via a crane. The one or more precast elements are then delivered from respective designated locations to one or more sections of the one or more floors of the building by a multi-wheeled equipment. Another method of building a precast concrete construction includes lifting one or more precast elements to respective designated locations...

Related articles:

Issue 01/2023

Retaining system for precast elements and manufacturing method

(10) EP 4 074 910 A1 (22) 15.04.2022 (43) 19.10.2022 (57) A retaining system (1) for constraining two precast elements (51, 52) for buildings, comprises a first anchoring insert (2; 32) associable...

more
Issue 12/2018

Precast concrete building elements and assemblies thereof, and related methods

(10) WO 2018/182769 A1 (22) 01.08.2017 (43) 04.10.2018 (57) An assembly of concrete structural elements includes a precast concrete lower column, a precast concrete column capital supported on an...

more
Issue 07/2016 (1o) US 9,347,232 B1

Lifting and leveling assembly for precast ­concrete slabs and method

(10) US 9,347,232 B1 (22) 13.01. 2015 (45) 24.05.2016 (57) A lifting and leveling assembly configured to be embedded in a precast concrete slab for lifting a leveling a precast concrete slab includes...

more
Issue 09/2019

Precast floor slab and method for forming a flooring deck and building formed of precast floor slabs

(11) EP 3 517 698 Al (22) 29.01.2019 (43) 31.07.2019 Bulletin 2019/31 (57) The invention relates to a floor slab, which is intended to form a flooring deck. The floor slab (26) in­cludes cast...

more
Issue 04/2019

Concrete building elements and assemblies thereof, and related methods

(10) WO 2019/027618 Al (22) 05.07.2018 (43) 07.02.2019 (57) An assembly of concrete structural elements includes a first and a second concrete lower column, and a first and a second column capitals...

more