New Head of Research & Development

Dr. Carsten Zilg (46) has been appointed Head of Research & Development at MC-Bauchemie with effect from 01 April 2016. In this function he bears responsibility for the entire product portfolio of the MC group of companies.

Following completion of a degree in chemistry and his doctorate, Zilg began his professional career in the year 2000 as Head of the R&D group at Gurit-Essex AG in Freienbach, Switzerland; moving on from there to the position of Head of R&D Europe. In 2004 he took up a post as Head of R&D at the Stuttgart site of an international construction chemicals manufacturer. One year later he assumed technical responsibility at the same company’s headquarters for the business units Floor, Façade and Concrete Protective Coatings, Liquid Films and Structural Adhesives for the Building Sector. In 2012 he also took over responsibility for Sports Flooring and Corrosion Protection Coatings, and as Corporate Technology Head for Coating Systems he led a team of 100 employees.

 

CONTACT

MC-Bauchemie Müller GmbH & Co. KG

Am Kruppwald 1-8

46238 Bottrop/Germany

+49 2041 101-0

www.mc-bauchemie.de

Related articles:

Issue 02/2020 Current status of the Tabsolar II project

Multifunctional façade panels for an improved carbon footprint

The Tabsolar concept intends to close a gap in terms of generating renewable energy using the building envelope. This design comprises slender, flow-through UHPC panels that are highly...

more

Dedicated management team assigned to MC-Bauchemie in Germany

The MC-Bauchemie Group has introduced a Management Committee specifically for Germany. Assigned wide-ranging responsibilities, the team has been managing much of MC's German business since September...

more

Giant logo on façade of MC-Bauchemie powder tower

Since a few days ago, a 20-by-4-metre logo of MC-Bauchemie has adorned the more than 50-meter high powder tower of the internationally active manufacturer of construction chemical products at its...

more
Issue 02/2021

Precast elements in the historic context – A prefabricated façade for the Jacoby Studios in Paderborn

The site of the former St. Vincenz State Hospital is located in the medieval city center of Paderborn, directly adjacent to the springs of the river Pader. Over a period of three years, the hospital...

more
Issue 02/2020 August Kühne Building in Bremen

Complex building situations shown on an stapeled architectural concrete façade

Building In 2018/19, a new office building was constructed at the original headquarters of the Kühne + Nagel logistics group in Bremen. Its predecessor completed in the 1960s was demolished because...

more