The building H7 at the city port in Münster, Germany, extends between the organic cheese plant and the company grounds of Cronos GmbH. The 7-story hybrid-construction building is the highest building...
(10) WO 2018/065524 Al
(22) 05.10.2017
(43) 12.04.2018
(57) Construction element (1) for a steel/reinforced-concrete hybrid beam comprising a metal girder (10) of U-shaped cross a section, formed of a...
The goal of circular economy is the transition from a linear, open economy to a circular, closed economy in which materials retain their value, resources are preserved and landfill waste avoided....
Fiber orientation has a significant effect on the load-bearing capacity of steel-fiber-reinforced concrete (SFRC) components. To optimize this orientation, an extrusion-based concreting method...
Modern buildings must increasingly ensure that technical installations be accommodated in the available intermediate floor space. Precast prestressed concrete beams can be used as an alternative to...