Max Frank

Egcobox Software 4.0:
design of cantilever slab connectors

Max Frank aims to set a new standard in the construction industry by launching the new Egcobox Software 4.0. Its easy-to-use, state-of-the-art user interface and intuitive operation should support engineers in saving a significant amount of time during the familiarization phase. The Egcobox Software 4.0 enables users to design cantilever slab connectors quickly and easily – a benefit that Max Frank refers to as “outstandingly simple”.

Tried-and-tested features of previous releases were retained, including project management and the selection of various languages and country-specific codes and standards.

Free input of ­balcony geometry­

Version 4.0 of the software includes various new features, such as the graphical 3D view of input parameters; free input of the balcony geometry as well as of the support situation and loads; consideration of upstands or recesses in the balcony slab; free input and positioning of balustrade, surface, linear and point loads; calculation and 3D visualization of support loads, deformations and Egcobox cantilever slab connections using the finite-element method.

Depending on the specific requirements, several formats are available for the output of results, including basic or detailed reports, parts or ordering lists, or 3D DXF export of the required Egcobox elements as an installation plan.

The Egcobox Software 4.0 can be downloaded from //www.egcobox-software.de" target="_blank" >www.egcobox-software.de:www.egcobox-software.de. This freeware can be tested for 14 days without registration. Users are asked to register to be able to use the Egcobox software beyond this 14-day test phase. Windows 7 or higher is required for software installation. A video tutorial that demonstrates operation of the software can also be accessed from this website.

x

Related articles:

Issue 10/2014 Max Frank

Cantilever slab connections for prestigious office complex

Directly adjacent to the “Ohligsmühle” stop of the aerial tramway in the German city of Wuppertal, a prestigious office building with a gross floor space of approx. 18,000 m² was erected. The...

more
Issue 03/2017 Schöck Bauteile

Living space with free space: solution for balcony design

Living space in Berlin has long become a scarce commodity – especially affordable one. With the ready-to-occupy Paragon Apartments on Danziger Strasse, Pankow has accepted this challenge and...

more
Issue 01/2011 Approved Egcobox® Cantilever Connection System with Articulated Thrust Bearing

Reduces Thermal Bridging to a Minimum

Egcobox with articulated thrust bearing meets highest, thermal requirements Three-dimensional thermal calculation models demonstrate in a realistic way how the system Egcobox works. The illustrations...

more
Issue 06/2022

CPC – a new concrete construction method: Highly resistant plug-in connectors between CPC slabs

The CPC-Optima (CPC = carbon-prestressed concrete) modular bridge system is suitable for pedestrian and cycle bridges. This trough bridge design comprises a deck slab and two lateral beams. The beams...

more
Issue 07/2016 Elbe Decken

Solid floor slab as special product for heavy loads

In February 2016, the extensive GWH Riedberg 2.0 project in Frankfurt am Main, Germany, was completed on schedule by the developer GWH Bauprojekte GmbH. The 71 barrier-free apartment, ranging from 66...

more