Related articles:

Issue 10/2019

Floor dowel sleeve for concrete

(10) US 2019/0257074 Al (22) 06.05.2019 (43) 22.08.2019 (57) A floor dowel sleeve is provided that includes a rectangular-shaped body portion having a cavity that is configured to receive a dowel...

more
Issue 04/2020

Slot drain for concrete slabs and method of forming concrete paving

(10) EP3601675 (A1) (43) 05.02.2020 (57) The slot drain 1 is configured to expand and contract in response to contraction and expansion of one or more adjacent concrete slabs. The slot drain may...

more
Issue 02/2014 Legal evaluation of defects

Semi-precast floors. Rust spots, traces of rubber abrasion, voids –

A developer is constructing a hotel and – as it subsequently turns out – requires the room ceilings to be smooth with a “premium-quality paint finish” and indirect lighting. Work is split among...

more
Issue 09/2019

Precast floor slab and method for forming a flooring deck and building formed of precast floor slabs

(11) EP 3 517 698 Al (22) 29.01.2019 (43) 31.07.2019 Bulletin 2019/31 (57) The invention relates to a floor slab, which is intended to form a flooring deck. The floor slab (26) in­cludes cast...

more
Issue 09/2015 Probst

Telescopic Screeding System TAS-UNI

Preparing the base grade is essential before installing pavement or slabs. In addition to a thoroughly compacted sub grade, a properly installed base grade at the right height is the most important...

more