Search

Your search for "" found 8030 Hits

Issue 08/2010 New masonry block

The Z block from Jasto

Masonry constructed of Z blocks (strength class 2) achieves a coefficient of thermal conductivity of lR = 0.07 W/mK. At a wall thickness of 36.5 cm a U-value of 0.18 W/m²K is reached. Blocks of...

more
Issue 08/2010 Reliable level measurement

Plumb bob system for the building materials industry

Level measurement – simple and accurate The measuring instrument basically consists of an electromechanically driven reel, a rope and/or a tape and a sensing weight fixed at the end. The instruments...

more
Issue 08/2010

• • • Short facts • • •⇥International  

1st International ETICS-Forum will be held in Brussels / Belgium on the 29th of September 2010. The European Association for the External thermal insulation composite systems will provide for English,...

more
Issue 08/2010 Kann invests in the future

New production facilities in the Mülheim-Kärlich factory

To keep the adjacent residential area free from acoustic impairments, the block making machine was integrated in a new factory building complying with special sound insulation requirements and...

more
Issue 08/2010 TBA Trimmiser Baustoffe AG

Report from practice on the X-Seed 100® accelerator from BASF

X-Seed 100 was introduced to the public by BASF Technology Center in Trostberg/Germany in the autumn of last year (BFT 01/10). The protected technology is based on seeding (injection) of the pore...

more
Issue 08/2010 A new construction system of Roland Wolf GmbH

Thepro® provides a number of advantages for precast concrete plants

Although, for many years now, the combination of precast components together with thermal insulation has been solved in many different ways, there were still a lot of potential objectives concerning...

more
Issue 08/2010 Prepared for winter production

From aggregate bays to a covered silo system

Until then the aggregates of the company were stored in aggregate bins outside, and were susceptible to the weather changes in Northern Germany during the winter months. Furthermore the aggregate bays...

more
Issue 08/2010 Monolithic manhole bases

Progress with a long tradition

The foundation stone of what is known as Betonwerk Heller today was laid as early as in 1919 in the “Sudetenland” region (today part of the Czech Republic). Immediately after the end of the Second...

more
Issue 08/2010 Longest passage in the Netherlands

Exceptional hollow beam

The Coen Tunnel is the connection between the regions in the north and south of the North Sea Canal. At present here are long traffic congestions at both sides every day especially during peak hours...

more
Issue 08/2010 Engineers as executives

People don’t tick like machines

Until a few years ago, the careers of engineers and scientists were extensively predetermined. They were there to do technical work. At best, they might become the head of a research und development...

more

Ihre Suche nach "" :

5375 Treffer in "AT Minerals"

8590 Treffer in "Bundesbaublatt"

8030 Treffer in "Betonwerk + Fertigteil-Technik"

7436 Treffer in "bauhandwerk"

1106 Treffer in "Brandschutz"

1086 Treffer in "Computer Spezial"

5093 Treffer in "dach+holzbau"

14622 Treffer in "Deutsche BauZeitschrift"

5493 Treffer in "FACILITY MANAGEMENT"

10646 Treffer in "Kälte Klima Aktuell"

5610 Treffer in "metallbau"

1372 Treffer in "recovery"

11619 Treffer in "SHK Profi"

12899 Treffer in "tab - Das Fachmedium der TGA-Branche"

11930 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

1984 Treffer in "tunnel"

5635 Treffer in "Zement Kalk Gips"

3412 Treffer in "Ziegelindustrie International"