Brazil: Concrete bridge for the Metro in Novo Hamburgo

In the Brazilian state of Rio Grande do Sul, Line 1 of the Trensurb, which already today connects Porto Alegre, Canoas, Esteio, Sapucaia do Sul, and Sao Leopoldo, is being extended. It is planned to connect the city of Novo Hamburgo to the rail network by a track section 9.3 km long, by the latest at the end of January 2012.

The investment will run to US$345 million, which is made available by the national foundation PAC (Programa de Aceleración del Crecimiento).

The objective is to reduce the very heavy traffic volume in the densely populated area and to improve the service of public transport. Following completion, a daily volume of around 30,000 passengers will be able to travel the total distance of 43 km length between Porto Alegre and Novo Hamburgo in 55 minutes.

The new track section between Sao Leopoldo and Novo Hamburgo will be guided across two parallel concrete bridges. Stops are planned every 1.5 ...

Related articles:

Issue 11/2019 TORRI

Precast concrete manufacturer and supplier – from a single source

As an editor of BFT, one gets around in the world (of precast concrete) a lot, thus one has already experienced and seen a lot, but the reception at Torri Engenharia e Saneamento in Novo Hamburgo near...

more
Issue 11/2014 D’Agostini/MBK

High-performance wire cage welding machine for Porto Alegre

More than 30 years after its establishment in 1961, MBK Maschinenbau GmbH of Kisslegg, Germany, expanded its business to the Latin American market: in July and November 1993, the first two wire cage...

more
Issue 11/2013

More than 27.000 precast units for the Lima Metro

Peru’s urban population continues to grow and as of June 2011 accounted for 74% of the total population, while rural population is 26%, according to the new population projections made by the...

more
Issue 05/2017

New type of concrete sleeper system for Baku’s metro lines

Plant specialist Vollert GmbH is currently realizing a new production plant for concrete sleepers in Baku. In addition to development services for the state-of-the-art plant technology, the project...

more
Issue 10/2017

Construction of the Panama Metro Line 2 with SCC

According to studies carried out by Metro de Panamá S.A., by the year 2035 the population that utilizes this sector will exceed 750,000 inhabitants, with a daily generation of 400,000 displacements...

more