The ESSB Building in Vancouver, Canada

Timber-concrete composite structures used in seismic regions

Timber-concrete composite floors are often used to meet particularly demanding structural specifications or to provide a high degree of insulation. The newly constructed Earth System Science Building (ESSB) is a multi-story laboratory and office building at the University of Vancouver that had to fulfil both criteria. Furthermore, the building is located in a seismic region. Whereas the original design had fully relied on reinforced concrete, about half of the building complex was constructed in a timber/wood composite design thanks to the Wood First Act initiative. As a result, the entire...

Related articles:

Issue 01/2017 Brüninghoff

Prefabricated composite floors

A so-called timber-concrete composite floor is a composite structure consisting of timber beams or panels and a concrete slab. These hybrid elements combine the properties of the two construction...

more
Issue 05/2024

A reversible, circular timber-concrete composite floor system

Timber-concrete composite floors can lower greenhouse gas emissions by reducing the concrete volume. In the composite section, the reinforced concrete slab primarily transfers normal compressive...

more
Issue 01/2023 BRÜNINGHOFF

Production of wood-concrete composite floor slabs optimized

The company Brüninghoff, a leading manufacturer of wood-concrete composite floor slabs (WCC floor slabs) in Europe, has further optimized the production process of these elements and is stepping up...

more
Issue 05/2024

Seeblickweg bridge – 70-meter long timber-carbon concrete composite bridge

With this 70-metre-long structure, both an optimum load transfer for the specified length of the bridge and an optimum symbiosis of the materials (timber, concrete, carbon reinforcement) in terms of...

more
Issue 06/2016 Brüninghoff

Hybrid precast hybrid building overcomes limitations

The building H7 at the city port in Münster, Germany, extends between the organic cheese plant and the company grounds of Cronos GmbH. The 7-story hybrid-construction building is the highest building...

more